Sprint Electrical Services

  • Home
  • About Us
    • About Sprint Electrical Service, Inc.
    • On-Site Story
    • On-Target Story
    • On-Time Story
    • Sprint Electrical Blog
  • Electrical Services
    • Control Panel Fabrication & Installation
    • Distribution/ New Service Installation
    • Generators / UPS
    • Installation and Equipment Relocation
    • Lighting Solutions
    • Troubleshooting
  • Preventative Maintenance & Safety
    • Arc-Flash Analysis – Know your Safety Margins
    • Breaker Testing
    • Insulation Testing
    • Machine Guarding
    • Switchgear Maintenance
    • Thermal Imaging
  • Contact
    • Suggestion Box
    • Employment

Insulation Testing

LEVEL 3 – MEGGER INSULATION TESTING

 

WHAT MAKES INSULATION GO BAD?

When your plant electrical system and equipment are new, the electrical insulation should be in top notch shape. Manufacturers of wire, cable, motors, and so on have continually improved their insulations for services in industry. However, even today, insulation is subject to many effects which can cause it to fail – mechanical damage, vibration, excessive heat or cold, dirt, oil, corrosive vapors, moisture from processes, or just the humidity on a muggy day.

In various degrees, these enemies of insulation are at work as time goes on – combined with the electrical stresses that exist.

As pin holes or cracks develop, moisture and foreign matter penetrate the surfaces of the insulation, providing a low resistance path for leakage current. Once started, the different enemies tend to aid each other, permitting excessive current through the insulation. Sometimes the drop in insulation resistance is sudden, as when equipment is flooded. Usually, however, it drops gradually, giving plenty of warning,
if checked periodically. Such checks permit planned reconditioning before service failure. If there are no checks, a motor with poor insulation, for example, may not only be dangerous to touch when voltage is applied, but also be subject to burn out.

What was once good insulation has now become a partial conductor.

The Sprint Electrical Team will supply highly-trained technicians to perform Insulation Testing to ensure all components are in proper working order and there are no apparent code violations, as well as hazardous conditions.

Download PDF – LEVEL 3 Insulation Testing 

847-981-0611

LEVEL 3 – MEGGER INSULATION TESTING

Sprint_Mnt_Program_Chart

 

The Sprint Electrical Promise:
To Be Extraordinary

Sprint is prepared for whatever electrical needs come up at your facility. Inside or outdoors, we’re always ready to help you stay powered up.

Sprint is dedicated to completely understanding your needs and responding quickly to what’s important to you. We listen, we plan and we deliver.

In all business, time is money. We deliver our value by keeping the project moving at a fast pace without compromise.

Sprint Electrical Service, Inc
1575 Jarvis Ave.
Elk Grove Village, IL 60007

847-981-0611

Recent Posts

  • Sprint Electrical Blog – Keeping Current

Member of ISN

isn-logo-2

Member of ABC

Screen Shot 2019-12-16 at 11.13.42 AM

Contact Us


    ©2026 Sprint Electrical Services. All rights reserved.
    Site Designed by Richterworks Web